• This community needs YOUR help today!

    With the ever-increasing fees of maintaining our vibrant community (servers, software, domains, email), we need help.
    We need more Supporting Members today.

    Please invest back into this community to help spread our love and knowledge of all aspects of IH Cub Cadet and other garden tractors.

    Why Join?

    • Exclusive Access: Gain entry to private forums.
    • Special Perks: Enjoy enhanced account features that enrich your experience, including the ability to disable ads.
    • Free Gifts: Sign up annually and receive exclusive IH Cub Cadet Tractor Forum decals directly to your door!

    This is your chance to make a difference. Become a Supporting Member today:

    Upgrade Now

Healy needed

IH Cub Cadet Tractor Forum

Help Support IH Cub Cadet Tractor Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

jamarks

Well-known member
IHCC Supporter
Joined
Feb 23, 2010
Messages
58
displayname
Jack Marks
I’m working on a CC 126, I. took the head off to replace a blown head gasket and now I’m having trouble trying to figure out exactly in what sequence the lock washers, spacers and nut goes on the studs protruding from the block, and up through the sheet metal on top of the head!
Is there a diagram somewhere??
 
It goes washer, nut, spacer.
That’s kind of what I thought,, so that’s what I tried, but then I have nothing left to install the sheet metal over the head! I had all of the studs, bolts, washers, and spacers in a container since I took the head off so I know there is nothing missing!
 
It goes washer, nut, spacer on the studs only. The bolts get the washers. A picture of the head and engine would help.
 

Latest posts

Back
Top